What a tiler quote should include

  • Area in m² per room or zone, measured at the quote visit
  • Substrate preparation — screed, levelling, sheet underlay — itemised
  • Waterproofing as its own line, with the certificate noted (wet areas must meet AS 3740)
  • Who supplies tiles, grout, silicone and trims — and the allowance if it's you
  • Tile layout (straight, diagonal, herringbone) and large-format handling where relevant
  • Waste removal and protection of finished areas
  • Your ABN, GST treatment, and quote validity period

Sample line items

Line itemUnitTypical range*
Floor tiling — labour + adhesive/groutper m²$50–$90
Wall tiling — labour + adhesive/groutper m²$60–$100
Waterproofing — membrane + certificateper m²$40–$70
Screed / floor levellingper m²$35–$60
Silicone, trims and finishingper job$80–$200

*Illustrative ranges only — every market and job is different, so set rates that work for your business. Eagle Invoice lets you save your own line items and reuse them on every quote.

Quoting tips from the field

  1. Photograph the substrate before quoting. A drummy slab or rotten fibre-cement sheet turns into a variation either way — better that it's priced up front.
  2. Name the waterproofing certificate on the quote. It costs you nothing to mention and it's the document the client needs at sale or inspection time.
  3. Price complex layouts as a visible multiplier. When herringbone costs 20% more and the quote says so, the client chooses with open eyes.
  4. Note tile supply clearly: client-supplied tiles mean you quote labour only, and the client owns breakages and shortfalls.

Common questions

Do tilers charge GST on quotes?

If you're registered for GST, show the ex-GST amount, the 10% GST, and the total separately — clients trust a quote they can follow. Once the job is done, the invoice for anything over $82.50 (incl. GST) must be a proper tax invoice showing your ABN.

Does waterproofing really need a certificate?

Wet-area waterproofing must comply with AS 3740 and the National Construction Code, and in most states it must be done (or certified) by a licensed waterproofer. Quoting the membrane and the certificate as their own line shows the client it's being done properly — and protects everyone if there's ever a leak claim.

Should the tiler or the client supply the tiles?

Either works — say which on the quote. When you supply, name the range and allowance so upgrades are a clean variation. When the client supplies, note that labour is quoted against tiles being on site, and that shortages or faulty batches pause the job at the client's cost.